Description
This powerpoint presentation begins by providing the premise of the presentation, which includes the following considerations: all projects involving a variable raw waterquality have “risk”;do alternate delivery projects have even morerisk from variable raw water supplies;who sets raw water quality;what time period to be considered;how many parameters; and,what are the remedies for raw water quality-basednon-performance? A case study of Tarpon Springs, Florida, is presented and covers the following topics:historically dependent upon regional supplier;desires water supply independence – 6.4 mgdfinished water production;very limited freshwater;available brackish aquifers subject to saltwater intrusion from tidally influencedAncloate River and lower aquifer connatewater; and,extensive groundwater modeling to assessminimum groundwater level impacts. Includes tables.
Product Details
- Edition:
- Vol. – No.
- Published:
- 11/01/2009
- Number of Pages:
- 7
- File Size:
- 1 file , 760 KB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus