Description
In 2000, the City of Jackson, Mississippi authorized the project team of Neel-Schaffer,Inc., Camp Dresser & McKee Inc. (CDM), and CiViLTech, Inc. to proceed withengineering services for the O. B. Curtis Water Treatment Plant Expansion project.Study and design services include pilot testing of water treatment technologies anddesign and bidding of an expansion to the O. B. Curtis Water Treatment Plant(OBCWTP) based on the outcome of the pilot testing. This paper details the outcome ofthe pilot testing and the basis of design for the OBCWTP expansion. Includes tables, figures.
Product Details
- Edition:
- Vol. – No.
- Published:
- 03/05/2003
- Number of Pages:
- 12
- File Size:
- 1 file , 250 KB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus