Description
This paper presents the process utilized by the Minneapolis Water Works (MWW) that willultimately result in 160 million gallons per day (mgd) of membrane treatment capacity for theCity of Minneapolis, Minnesota. The MWW utilized a two-prong solution: a technical solution and apolitical solution. Three major activities are described that led to the final decision of a lowpressure membrane system: Feasibility Study; Value Engineering Study; and, Citizen’s AdvisoryCommittee Meetings.2001 (C) American Water Works Association Membrane Conference Proceedings All Rights Reserved Includes tables.
Product Details
- Edition:
- Vol. – No.
- Published:
- 05/01/2001
- Number of Pages:
- 7
- File Size:
- 1 file , 180 KB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus