AWWA IMTECH62897

$14.00

Proof-of-Concept: The Result
Conference Proceeding by American Water Works Association, 03/01/2006

Document Format: PDF

Description

This slide presentation outlines the City of Henderson’s laboratory information management system (LIMS) procurement. Objectives of the presentation include: provide overview of proof-of-conceptmethodology;describe the benefits andchallenges of using the proof-of-conceptmethodology; and,discuss the result of our proof-of-conceptproject. Topics outlined include: LIMS Project History; Original Project Phases; Proof of Concept; Adjusted Project Phases; Proof-of-ConceptInstrument Interfacing; Proof-of-ConceptSystem Parameters; Proof-of-Concept Phases; Proof-of-Concept Benefits and Considerations; and, Post POC – Benefits and Considerations.

Product Details

Edition:
Vol. – No.
Published:
03/01/2006
Number of Pages:
23
File Size:
1 file , 240 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus