Description
This powerpoint presentation begins by providing a brief overview of a project at East Valley Water District near San Bernardino, California, to construct a new watertreatment plant (WTP) to treat groundwatercontaminated with perchlorate. The WTP will include new storage reservoirsand a dual pressure zone pump station that will distribute water to theLower Zone and transfer water to theIntermediate Zone.The pump station design must accommodatecurrent, intermediate, and ultimate demands. Pumping requirements are presented, along withpump station configuration,pump selections, and ahydraulic model. Includes tables, figures.
Product Details
- Edition:
- Vol. – No.
- Published:
- 11/01/2009
- Number of Pages:
- 24
- File Size:
- 1 file , 240 KB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus