Description
This slide presentation outlines information on cleaning and lining of transmission mains in the Chicago water system. Topics covered include: map of the city of Chicago water supply area; distribution system pipe diameter and length; water main replacement; reasons for relining; Hazen and Williams C-Factor; range of C-factors; Wabansia Ave. lining project; Harlem Ave. lining project; project scope for Wabansia main; site excavation; lining the water main; hydraulic improvements after cleaning and lining project; and, cost and time comparison for Wabansia main between relining vs. replacement.
Product Details
- Edition:
- Vol. – No.
- Published:
- 09/29/2004
- Number of Pages:
- 65
- File Size:
- 1 file , 5.8 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus