AWWA ACE95049

$14.00

From Model to Full Scale: Modification of a Reservoir to Improve Contact Time
Conference Proceeding by American Water Works Association, 01/01/1995

Document Format: PDF

Description

Like many utilities using surface water, ACWD is faced with the challenge of meeting the disinfection requirements of the Surface Water Treatment Rule while also minimizing disinfection byproduct formation. These two competing objectives were motivation behind this plant modification project. This paper discusses the proposed modifications, describes the modeling study and results, and details the implementation of the full-scale modification process. The full-scale project involved modifications to the treated water reservoir, new processes for continuous sampling (upstream and downstream), and comprehensive test and start-up plans.

Product Details

Published:
01/01/1995
ISBN(s):
0898678331
Number of Pages:
15
File Size:
1 file
Note:
This product is unavailable in Ukraine, Russia, Belarus