Description
The Boston Water and Sewer Commission (BWSC) embarked on a pilot project to downsize large meters as part of its efforts to reduce unaccounted-for water. A Commission task force had identified the fact that a potentially great amount of water was not accounted-for at low rates of flow due to oversized meters. A team was assembled to implement a comprehensive project to investigate water usage and downsize large meters. Rate-of-flow measurement devices were used to more accurately determine proper meter size, and changes in unaccounted-for water were tracked. Over a year’s worth of consumption data from downsized accounts has allowed the project team to analyze results in the context of seasonal differences in water usage is presented.
Product Details
- Published:
- 01/01/1992
- ISBN(s):
- 0898676533
- Number of Pages:
- 21
- File Size:
- 1 file
- Note:
- This product is unavailable in Ukraine, Russia, Belarus