AWWA ACE91214

$14.00

Maintenance of Service and Customer Relations
Conference Proceeding by American Water Works Association, 01/01/1991

Document Format: PDF

Description

Once a determination has been made to rehabilitate an existing water main, your next thoughts must be centered on supplying continuous domestic service and fire protection. In some instances, but very few, shutdown of water mains for very short periods on a daily basis can be tolerated while work is being carried out. Under normal conditions cleaning and lining projects are almost certain to require extensive shutdowns, thereby necessitating the need for bypass piping.

Product Details

Published:
01/01/1991
ISBN(s):
0898675928
Number of Pages:
12
File Size:
1 file
Note:
This product is unavailable in Ukraine, Russia, Belarus