Description
This powerpoint presentation begins by providing a brief overview of the Western Corridor Recycled Water Project. Key technical objectives include:capture dry-weather flowsfrom six wastewatertreatment plants;treat to ADWG (and nowAGWR);transfer to Swanbank,Tarong and Wivenhoe; and,provide an environmentalbenefit by reducing nutrientrelease to the environment. Topics presented include: indirect potable reuse; treatment process; recycled water management plan; AWTP validation plan; commissioning verification; HACCP validation; and, water quality report.
Product Details
- Edition:
- Vol. – No.
- Published:
- 11/01/2009
- Number of Pages:
- 16
- File Size:
- 1 file , 4.1 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus