AWWA ACE70483

$14.00

Frontline Responses to Treatment Plant Optimization: Experiences from the City of Houston's East Water Purification Plant
Conference Proceeding by American Water Works Association, 11/01/2009

Document Format: PDF

Description

This powerpoint presentation discusses a project at the City of Houston’s (Texas) East Water Purification Plant (EWPP) called the Treatment Optimization and Support Project(TOSP). It was initiated in 2008 as amulti-year project for theoptimization ofsurface water plants,groundwater plants, re-pump stations, and thedistribution system. Project goals were toreduce chemical/energy costs, andmaintain superior water quality. Key drivers for the study are provided, along with a brief overview of Houston’s EWPP, a comprehensive performance evaluation (CPE), and performance limiting factors (PLFs). Includes tables, figures.

Product Details

Edition:
Vol. – No.
Published:
11/01/2009
Number of Pages:
25
File Size:
1 file , 4.8 MB
Note:
This product is unavailable in Ukraine, Russia, Belarus