Description
This powerpoint presentation asks the question: “How can Owners/Engineers procure equipment or systems from qualified suppliers on a competitive basis without the method of procurement itself becoming an impediment to the success of the project?” It lists the required components of a procurement method, or bid form, and discusses bid form options that include: Conventional Open Bid;Base Bid;Base Bid + Deductive Alternate(s);Evaluated Bid; and, Pre-Selection Bid.
Product Details
- Edition:
- Vol. – No.
- Published:
- 06/01/2007
- Number of Pages:
- 15
- File Size:
- 1 file , 610 KB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus