Description
This powerpoint presentation begins by providing background information on the City of Live Oak, California, water upgrades. Statistics on wells and arsenic levels are given, along with historic arsenic levels from 1999 to 2004, and water demand in 2005. Removal technologies are outlined along with topics that include: bench testing and RFP process; review of bench testing results; review of life cycle evaluation; and, an update on a future pilot program where piloting will be initiated to confirm bench results andconfirm key design parameters forarsenic performance,Mn performance,O&M costs, andlayout.
Product Details
- Edition:
- Vol. – No.
- Published:
- 06/01/2007
- Number of Pages:
- 26
- File Size:
- 1 file , 1.4 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus