Description
This powerpoint presentation discusses a project at the City of Houston’s (Texas) East Water Purification Plant (EWPP) called the Treatment Optimization and Support Project(TOSP). It was initiated in 2008 as amulti-year project for theoptimization ofsurface water plants,groundwater plants, re-pump stations, and thedistribution system. Project goals were toreduce chemical/energy costs, andmaintain superior water quality. Key drivers for the study are provided, along with a brief overview of Houston’s EWPP, a comprehensive performance evaluation (CPE), and performance limiting factors (PLFs). Includes tables, figures.
Product Details
- Edition:
- Vol. – No.
- Published:
- 11/01/2009
- Number of Pages:
- 25
- File Size:
- 1 file , 4.8 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus