AWWA MTC61087

$14.00

Price Sensitivity for Evaluated Bid Membrane Procurements
Conference Proceeding by American Water Works Association, 03/01/2005

Document Format: PDF

Description

This slide presentation outlines information on pricing issues for evaluated bid membrane procurements. Topics covered include: aspects of evaluated bid process of microfiltration/ultrafiltration membrane procurements; microfiltration/ultrafiltration membraneprocurements are almost always by “evaluated bid”; chief components forcapital construction; retrofit applications can also consider the cost of existing facility rehabilitation; operational and replacement cost considerations; Barberton, Ohio, case study; comparison of three proposals with highly competitive pricing; significant relative differences found for O&M costs; and, results of cost evaluation.

Product Details

Edition:
Vol. – No.
Published:
03/01/2005
Number of Pages:
11
File Size:
1 file , 560 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus