Description
This powerpoint presentation begins by providing a brief overview of the City of Sugar Land’s plans to build a surface water treatment plant of9 mgd initial capacity, with 22 mgd ultimate capacity to meet the Fort Bend Subsidence District mandatedreduction of groundwater use requirement by30% by 2013, and 60% by 2025. Pilot testing goals included the following:confirm that the selected treatment train canmeet the City’s water quality goals;establish key design/operating criteria to enable”right sizing” of treatment processes; and,meet TCEQ requirements for pilot testing of”innovative technologies”. The benchmark treatment train is presented, along with the pilot treatment train, and the microfiltration/ultrafiltration (MF/UF) pilot testing program. Testing results are provided for the following: MF/UF testing; reverse osmosis (RO) testing; clarifier pilot testing; and, granular activated carbon (GAC) testing. Recommended next steps include the following:simulate pretreatment process upset;MF/UF testing under process upset mode;MF/UF fiber cut demonstration;pilot facility decommissioning;draft pilot test report preparation; and,complete corrosion coupon tests. Includes tables, figures.
Product Details
- Edition:
- Vol. – No.
- Published:
- 11/01/2009
- Number of Pages:
- 29
- File Size:
- 1 file , 2.9 MB
- Note:
- This product is unavailable in Ukraine, Russia, Belarus